Things are moving along now! The plumbing, HVAC, and electric are all in and they are hanging drywall now. You can really get a feel for how its going to look now. We finalized all of the kitchen and other cabinet details today including the hardware, so the cabinetry will be ordered at the end of this week. Hopefully next week they will be starting the cement board siding. I am pretty much finished selecting paint colors for all of the rooms, and just have to pick out the actual light fixtures that we are using, although I am pretty close to finishing that as well. Jim had the pool crew out there today figuring out exactly the placement of the pool and hot tub and fence. (Yes, I know we have an 18,000 acre lake in our front yard, but he has always wanted a pool…so whatcha gonna do? He deserves it!). We are hoping to be in it around mid-February, but we shall see.
Here is the great room…the fireplace will be stone to the ceiling with an inset for the tv…there is a huge display ledge for pictures beneath the transom windows:

Standing at the great room window & looking into the kitchen/breakfast room:

In the kitchen looking out to the breakfast area:

Standing at the great room window looking back to the front door…you can see the stairs and the bridge right above the beam…it will be open on both sides to the entry and great room, and will have an iron railing:

Standing on the bridge looking down into the great room:

Looking into the room over the garage where the grandkids’ bunks & playroom will be…it is now drywalled since I took this picture yesterday!

On our screened porch:

One of the upstairs guest rooms with a vaulted ceiling…the dormer window & side window both have great lake views:

My office:
Our view keeps getting more open as the leaves disappear!

Total of 6 bedrooms and 5 1/2 baths…we should be able to sleep a minimum of 18 comfortably…plenty of room for all of you to visit!